Suchergebnisse

Nachstehend finden Sie die Ergebnisse der Suchmaschine zu ihrer Anfrage.

Zeigen 1701-1710 von 2416 Ergebnisse

flex tc ja 3 22

5 Things You Need to Know About the European Union’s Latest TiO₂ Regulatory Updates

Working within a global market requires global responsibility.

Wir stellen Ihnen heute Track and Trace auf dem Ti-Pure™ Connect Portal vor.

Echtzeit-Tracking mit einem Mausklick!

Chemours Provides COVID-19 Grant to Humphreys County School

Chemours Johnsonville to Assist In Establishing A Virus-Save School Environment

Ti-Pure™ Titanium Dioxide Distributors: Versatile. Convenient. Local.

We are proud to partner with a trusted network of distributors across the US and Canada, committed to delivering high quality customer support. This purchasing solution offers many benefits, including less than full truckload (LTL) supply capability.

SAMPLING SITE 48 RESIDENTIAL WELL CARBON PILOT HFPO-DA, TABLE 3 and PFAS CONCENTRATIONS

Chemours Fayetteville Works, North Carolina

Out Outfall 002 GAC Pilot Study Interim Results Report Chemours Fayetteville, North Carolina Facility August 2019

Parsons Infrastructure (Parsons) is pleased to present this interim report summarizing results obtained todate during operation of the Old Outfall 002 (OOF2) GAC pilot treatment system.

Submission of PFAS Non-Targeted Analysis and Methods Interim Report Chemours Fayetteville Works, Fayetteville, NC

Chemours is submitting the enclosed PFAS Non-Targeted Analysis and Methods Interim Report #3. This report is prepared pursuant to Paragraph 11(a) in the executed Consent Order entered February 25, 2019 between Chemours and the North Carolina Department of Environmental Quality (DEQ) with the Cape Fear River Watch (CFRW), and the PFAS Non- Targeted Analysis and Methods Development Plan, Version 2 (the Development Plan, Chemours and Geosyntec, 2019), the June 30, 2020 PFAS Non-Targeted Analysis and Methods Interim Report (Chemours, June 2020) and the December 31, 2020 PFAS Non-Targeted Analysis and Methods Interim Report #2 (Chemours, December 2021)

Consent Order Progress Report For Fourth Quarter 2023

Submissions to the State of North Carolina and Cape Fear River Watch

CFR Long-Term Remedy Performance Monitoring Report #4 October – December 2023

This CFR Long-Term Remedy Performance Monitoring Report #4 (“Report”) has been prepared for the Q4 2023 period of October 1 through December 31, 2023 and documents the operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex- Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).