Suchergebnisse

Nachstehend finden Sie die Ergebnisse der Suchmaschine zu ihrer Anfrage.

Zeigen 2101-2110 von 2507 Ergebnisse

Laboratory Analyses for MTP, MMF, DFSA, and PPF Acid June 18, 2019

Responses to Comments on Paragraphs 11.a and 11.b Submissions May 6, 2019

On December 30, 2018 and January 30, 2019, Chemours made submissions to you pursuant to paragraphs 11.b and 11.a of the Consent Order, respectively

Submission of Old Outfall 002 Remedial Options Plan Pursuant to Consent Order Paragraph 12.e May 20, 2019

Paragraph 12.e of the Consent Order requires Chemours to submit a plan within ninety days of entry of the Consent Order that analyzes the following remedial options for Old Outfall 002

Drinking Water Compliance Plan

Chemours Fayetteville Works RCRA Permit No. NCD047368642-R2-M3

LC/MS/MS Method Performance for DFSA

This technical memorandum addresses questions regarding observed variability in the determination of DFSA (difluorosulfoacetic acid) by Eurofins TestAmerica’s current LC/MS/MS methodology, known as the ‘Table 3+’ analytical method.

Submission of Quarterly Report #3 – Characterization of PFAS in Process and Non-Process Wastewater and Stormwater – Chemours Fayetteville Works, Fayetteville, NC. January 31, 2020

Chemours is submitting the enclosed Quarterly Report #3 – Characterization of PFAS in Process and Non-Process Wastewater and Stormwater, prepared by our consultant Geosyntec Consultants of NC, P.C.

Belgium signs ChemFEST partnership with TSM

Chemours Belgium recently formalized a three-year ChemFEST partnership with Technische Scholen Mechelen (Technical School of Mechelen (TSM)), solidifying the commitment to local STEM education.

Samenwerking met Technische Scholen Mechelen (TSM)

Eind juni 2023 ondertekende Chemours een driejarige samenwerking met Technische Scholen Mechelen (TSM).

Cape Fear River PFAS Mass Loading Assessment – First Quarter 2022 Report June 30, 2022

Chemours pleegt vanaf september groot onderhoud aan fabrieken

Belangrijke onderhoudsstop voor verantwoorde en veilige productie duurt enkele maanden